Projects

Scope Of Activity:
Year:
BAB Gas Compression Project, Abu Dhabi, UAE
CLIENT: ZADCO
MAIN CONTRACTOR: SK Engineering

FIRE PROOFING WORKS - Year: 2012
Habshan 5 Process Plant NGL Package - Abu Dhabi
CLIENT: GASCO
MAIN CONTRACTOR: Technimont/Kharafi National/Al Nasr Contracting
JGC-CCIC

FIRE PROOFING WORKS - Year: 2011
Habshan Flare Gas Recovery Project - Abu Dhabi
Fire Proofing for Steel Structures
CLIENT: GASCO
MAIN CONTRACTOR: CCIC

FIRE PROOFING WORKS - Year: 2011
LANDMARK Project - Abu Dhabi, UAE
Supply & Apply of Intumescent Fire Proofing Works
MAIN CONTRACTOR: Al Habtoor Engineering

FIRE PROOFING WORKS - Year: 2011
Habshan 5 IGD Project - Abu Dhabi, UAE
Hot & Acoustic Insulation works
CLIENT: GASCO
MAIN CONTRACTOR: JGC - CCIC

INSULATION WORKS - Year: 2011
Habshan 5 Process Plant Project NGL Package, Abu Dhabi, UAE
CLIENT: GASCO
MAIN CONTRACTOR: Technimont/Kharafi National/Al Nasr Contracting

SCAFFOLDING WORKS - Year: 2011
DEEP PANUKE PFC Project, Abu Dhabi, UAE
CLIENT: ENCANA
MAIN CONTRACTOR: GPC/SBM OFFSHORE

INSULATION WORKS - Year: 2011
Fuel Storage Tank at Umm Al Nar, Abu Dhabi, UAE
Removal and Re-insulation of tank 5113 FB- Insulation works
CLIENT: TAKREER
MAIN CONTRACTOR: IMECO

INSULATION WORKS - Year: 2011
Petrofab Insulation
Supply and Installation of Insulation Works on Tanks and Scaffolding works
MAIN CONTRACTOR: PETROFAB International LLC

SCAFFOLDING WORKS - Year: 2010
Emirati Housing Community, Abu Dhabi, UAE
CLIENT: TABREED
MAIN CLIENT: CAT Group

INSULATION WORKS - Year: 2010
Thermal Insulation & Cladding Work,for DLB1000 Exhaust Lines, Abu Dhabi, UAE
CLIENT: NPCC
MAIN CONTRCATOR: NPCC

INSULATION WORKS - Year: 2010
Pearl of Emirates for Tamouh Plot - 1, Abu Dhabi, UAE
CLIENT: TABREED
MAIN CLIENT: CAT Group

INSULATION WORKS - Year: 2010
MASDAR Institute of Science & Technology - Abu Dhabi, UAE
CLIENT: Mubadala/Masdar
MAIN CONTRACTOR: Al Ahmadiah - Hip hing JV

FIRE PROOFING WORKS - Year: 2010
Shuweihat S2 WIPP - Phase 2, Abu Dhabi, UAE
CLIENT: ADWEA
MAIN CLIENT: HAMCHANG

INSULATION WORKS - Year: 2010
Taweelah Exhaust System for Gas Turbines, Abu Dhabi, UAE
Insulation & Cladding  Works
CLIENT: TAPCO
MAIN CONTRACTOR: AAF International

INSULATION WORKS - Year: 2010
CCAD ETS - Sowwah Island, Abu Dhabi, UAE
CLIENT: TABREED/MUBADALA
MAIN CONTRACTOR: CAT Group

INSULATION WORKS - Year: 2010
ONGC Deck RS -12 at NPCC Mussafah Yard , UAE
Supply and installation of  insulation and jacketing
CLIENT: ONGC
MAIN CONTRACTOR: NPCC

INSULATION WORKS - Year: 2010
ONGC Deck - Insulation - Piping & Equipments, Abu Dhabi, UAE
CLIENT: ONGC
MAIN CONTRACTOR: NPCC

INSULATION WORKS - Year: 2010
Al RAHA beach Development, Abu Dhabi, UAE
CLIENT: TABREED
MAIN CONTRACTOR: AL NASR Contracting

INSULATION WORKS - Year: 2010
Abu Dhabi Financial Council - ADFC Project - Abu Dhabi, UAE
Fire Stopping works
CLIENT: Mubadala
MAIN CONTRACTOR: OGER / THERMO

FIRE PROOFING WORKS - Year: 2010
Construction of Laboratory & Safety Buildings
Fire Proof Painting
CLIENT: GASCO
MAIN CONTRACTOR: CODE Contracting

FIRE PROOFING WORKS - Year: 2010
SORBONNE University - Reem Island, Abu Dhabi, UAE
CLIENT: Sorbonne University
MAIN CONTRACTOR: Specialized Architectural System (SAS)

PAINTING WORKS - Year: 2010
LANDMARK Project, Abu Dhabi, UAE
MAIN CONTRACTOR: AL Habtoor Engineering

PAINTING WORKS - Year: 2010
Ruwais Refinery Phase 2 Project - Abu Dhabi, UAE
CLIENT: TAKREER
MAIN CONTRACTOR: INTHERPO

FIRE PROOFING WORKS - Year: 2010
Capitalization of ABJ New Logistics base in ICAD III - Abu Dhabi UAE
CLIENT: Kharafi National
MAIN CONTRACTOR: INTHERPRO

FIRE PROOFING WORKS - Year: 2010
Shuweihat S2 Project, Abu Dhabi, UAE
Insulation & Painting Maintenance
CLIENT: ADWEA / SCIPCO
MAIN CONTRACTOR: INTHERPRO

PAINTING WORKS - Year: 2010
Construction Works for Asab, Sahil, AGGI and Shah Oil Facilities Modification, Abu Dhabi, UAE
Supply and Installation of Insulation Works for piping
CLIENT: ADCO
MAIN CONTRACTOR: ALSA Engineering & Construction Co.

INSULATION WORKS - Year: 2010
Saadiyat Al MANARAT - Abu Dhabi, UAE
Fire Stopping Works
CLIENT: ALDAR
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2010
National Reference Laboratory
CLIENT: Mubadala
MAIN CONTRACTOR: Al Fara'a General Contracting

FIRE PROOFING WORKS - Year: 2010
Paris SORBONNE University - Abu Dhabi, UAE
CLIENT: Sorbonne University
MAIN CONTRACTOR: Al Habtoor Engineering

FIRE PROOFING WORKS - Year: 2010
Ritz Carlton Abu Dhabi Resort & SPA - Abu Dhabi, UAE
Fire Stopping works
CLIENT: Ritz Carlton
MAIN CONTRACTOR: Al Habtoor Engineering

FIRE PROOFING WORKS - Year: 2010
Saadiyat Al Manara Project - Abu Dhabi, UAE
Fire Stopping works
CLIENT: ALDAR
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2010
Ruwais Refinery - Phase 2, Abu Dhabi, UAE
CLIENT: TAKREER
MAIN CONTRACTOR: INTHERPRO

SCAFFOLDING WORKS - Year: 2010
Link Golf Club House, Yas Island - Abu Dhabi, UAE
Supply & Application of Fire Sealants
CLIENT: TDIC
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2009
Dubai Metro Project - Entrance Pods Red Line - Dubai, UAE
Fire Proofing to Structural Steel
CLIENT: RTA
MAIN CONTRACTOR: JT Metro JV

FIRE PROOFING WORKS - Year: 2009
Dubai Metro Project - Steel Canopies AL Rigga/City Centre, UAE
Fire Proofing to Structural Steel
CLIENT: RTA
MAIN CONTRACTOR: Gold York

FIRE PROOFING WORKS - Year: 2009
UAE University New Campus PPP Development
Supply & Apply of Intumescent Fire Proofing
CLIENT: Mubadala
MAIN CONTRACTOR: OGER Abu Dhabi

FIRE PROOFING WORKS - Year: 2009
Refractory Works on laundry Boiler
CLIENT: ZADCO
MAIN CONTRACTOR: ADOS

REFRACTORY WORKS - Year: 2009
Raceday Hotels, Yas Island - Plot H01 & H02 - Abu Dhabi, UAE
Fire Sealing works
CLIENT: TDIC
MAIN CONTRACTOR: Al Habtoor Engineering

FIRE PROOFING WORKS - Year: 2009
Jebel Ali Station "M", Dubai, UAE
CLIENT: ADWEA
MAIN CONTRACTOR: FISIA Italimpianti

SCAFFOLDING WORKS - Year: 2009
Onshore Associated Gas Expansion Project - OAG - Habshan, Abu Dhabi, UAE
Hot & Acoustic Insulation works
CLIENT: GASCO
MAIN CONTRACTOR: CCIC

INSULATION WORKS - Year: 2009
Shuweihat S1, Abu Dhabi, UAE
Supply of Manpower and Equipment for Insulation, Painting and Scaffolding
CLIENT: ADWEA
MAIN CONTRACTOR: SCIPCO

SCAFFOLDING WORKS - Year: 2009
Jebel Ali Power and Desalination Station 'M' , Dubai, UAE
Insulation & Painting works
CLIENT: DEWA
MAIN CONTRACTOR: FISIA Italimpianti

PAINTING WORKS - Year: 2009
Dubai Metro Project - Entrance Pods Red Line, Dubai, UAE
CLIENT: RTA
MAIN CONTRACTOR: JT Metro JV

PAINTING WORKS - Year: 2009
Dubai Metro Project - Steel Canopies AL Rigga/City Centre. Dubai, UAE
CLIENT: RTA
MAIN CONTRACTOR: Gold York

PAINTING WORKS - Year: 2009
Shuweihat S2 WIPP - Phase 2, Abu Dhabi, UAE
CLIENT: ADWEA
MAIN CONTRACTOR: HAMCHANG

SCAFFOLDING WORKS - Year: 2009
Jebel Ali Station "M", Dubai, UAE
Thermal & Acoustic Insulation
CLIENT: TABREED
MAIN CONTRACTOR: Fisia Italimpianti

INSULATION WORKS - Year: 2009
Yas Island Tabreed District Cooling Plant YI01 & YI02, Abu Dhabi, UAE
Supply & Application of Insulation and Cladding works
CLIENT: TABREED
MAINCONTRACTOR: CAT Group

INSULATION WORKS - Year: 2009
Between The Bridges Project - Traders Hotel, Abu Dhabi, UAE
Fire Sealing works
CLIENT: Shangri - La Hotel
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2009
Power Complex in Abu Dhabi International Airport
Replacement of Switchgear & Power Network System
CLIENT: ADWEA
MAIN CONTRACTOR: Electro Mechanical Co.

FIRE PROOFING WORKS - Year: 2009
Hotels H3 & H4 - Crown Plaza and Staybridge - Abu Dhabi, UAE
Fire Sealing works
CLIENT: Crown Plaza
MAIN CONTRACTOR: Interbeton, Abu Dhabi

FIRE PROOFING WORKS - Year: 2009
Power Network Dev't. Works for Industrial of Abu Dhabi (ICAD), Emirates Iron & Steel Factory (IESF) and Private Emirates Steel Lot 2A1 New 22kV Substation - Abu Dhabi, UAE
Fire Proofing to Structural Steel
CONTRACTOR: DEWA
MAIN CONTRACTOR: Electro Mechanical Co.

FIRE PROOFING WORKS - Year: 2009
Primary Substation at ICAD II - Abu Dhabi, UAE
Supply & Application of Intumescent Fire Proofing
CLIENT: ADWEA
MAIN CONTRACTOR: Electro Mechanical Co.

FIRE PROOFING WORKS - Year: 2009
Habshan Gas Complex Expansion Project - HGCE - Abu Dhabi, UAE
Fire Proofing for Pipe Racks & Equipment Skirts
CLIENT: GASCO
MAIN CONTRACTOR: CCIC

FIRE PROOFING WORKS - Year: 2009
OAG Associated Gases Project No: 5234 - Abu Dhabi, UAE
Fire Proofing for Pipe & Equipment Skirts
CLIENT: GASCO
MAIN CONTRACTOR: CCIC

FIRE PROOFING WORKS - Year: 2009
Tabreed District Cooling Scheme SW01, SOWA Island Distribution Piping Network, Abu Dhabi, UAE
Supply & Installation of Insulation works
CLIENT: TABREED
MAIN CONTRACTOR: CAT Group
 

INSULATION WORKS - Year: 2009
Qasr Al Sarab Desert Resort, Liwa Dist. - Abu Dhabi, UAE
Fire Sealing works
CLIENT: TDIC
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2009
SORBONNE University - Reem Island, Abu Dhabi, UAE
CLIENT: Sorbonne University
MAIN CONTRACTOR: Specialized Arch. System (SAS)

FIRE PROOFING WORKS - Year: 2009
MASDAR Institute of Science & Technology, Abu Dhabi, UAE
Supply & Apply of Fire Stopping system
& Intumescent Fire Proofing works
CLIENT: Mubadala / Masdar
MAIN CONTRACTOR: Al Ahmadiah - Hip hing JV

FIRE PROOFING WORKS - Year: 2009
Burj Dubai Development Old Town Commercial Island, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Al Naboodah Laing O' Rouke

FIRE PROOFING WORKS - Year: 2008
Dubai Festival City, UAE
MAIN CONTRACTOR: Higgs & Hill

FIRE PROOFING WORKS - Year: 2008
FRADE FPFO REPAR AND REVAP PROJECT,Abu Dhabi, UAE
Mechanical Thermal Insulation
CLIENT: PETROBAS / UOP EQUITEC SERVICES INC
MAIN CONTRACTOR: Al Jaber Energy Services

INSULATION WORKS - Year: 2008
Media One, Media City, Dubai, UAE
Fire Sealants
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2008
AL Sufouh Mixed Use Development, Tecom, Dubai, UAE
Fire Retardant Mortar
MAIN CONTRACTOR: Wells LLC

FIRE PROOFING WORKS - Year: 2008
Dubai International Financial Centers (DIFC), Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Turner International

FIRE PROOFING WORKS - Year: 2008
Tabreed District Cooling Scheme ADO2 Abu Dhabi National Exhibition, Centre External Pipe Works, ETS & Connection to Tabreed CHW Network Abu Dhabi, UAE
CLIENT: TABREED
MAIN CONTRACTOR: CAT Group

INSULATION WORKS - Year: 2008
Dubai Festival City-Repair works 1 Level Parking, Dubai, UAE
Spray Thermal Accoustical Insulation
MAIN CONTRACTOR: Hyperpanda

FIRE PROOFING WORKS - Year: 2008
Saba Tower-2, (B+G+36) on plot No.E-3, Jumeirah Lake towers for M/s. Saba Real Estate, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Reliance Electro Mechanical Plumbing

FIRE PROOFING WORKS - Year: 2008
GCAA New Area Navigation Services Sire-Abu Dhabi, UAE
FP for complete Structural Steel works
MAIN CONTRACTOR: Anthena Emirates LLC

FIRE PROOFING WORKS - Year: 2008
2B + G + 3 Office Building (PE-099) Johnson & Johnson HQ At Health Care City, Dubai, UAE
Fire Rated Coating
MAIN CONTRACTOR: Condor Building Contracting

FIRE PROOFING WORKS - Year: 2008
Ras Laffan Olefin Project, Doha, Qatar
Supply & Installation of Refractory works in furnace & boilers
CLIENT: QATAR GAS
MAIN CONTRACTOR: Lahoud Engineering

REFRACTORY WORKS - Year: 2008
Requisition #5005-52 GPP # 310000 Remelt & Common Sulphur Tanks,UAE
CLIENT: Polychem
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2008
Sharjah Cement Filter Insulation, Sharjah, UAE
CLIENT: Sharjah Cement Factory
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2008
Index Building- DIFC, Dubai, UAE
Fire Resistant Coating to Duct works
MAIN CONTRACTOR: BK GULF

FIRE PROOFING WORKS - Year: 2008
Al Aweer Power Project, Dubai, UAE
CLIENT: DEWA
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2008
Dubai Metro Project, Dubai, UAE
Fire Proofing Works and Scaffolding Works
CLIENT: RTA
MAIN CONTRACTOR: JT Metro JV

SCAFFOLDING WORKS - Year: 2008
Executive Towers, Dubai, UAE
Fire Rated Duct Works and Scaffolding works
MAIN CONTRACTOR: IRON World

SCAFFOLDING WORKS - Year: 2008
CCPP22 Project, Dubai, UAE
Insulation for HRSG Boilers
CLIENT: DUBAL
MAIN CONTRACTOR: CMI

INSULATION WORKS - Year: 2008
Naptha Hydro Treater Reformer - Main Civil Works
CLIENT: ENOC
MAIN CONTRACTOR: AL Futtaim Carrillion

FIRE PROOFING WORKS - Year: 2008
Dubai Metro Project - Over Ground Stations DM 001, Dubai, UAE
MAIN CONTRACTOR: AL Habtoor Engineering

PAINTING WORKS - Year: 2008
UAE University New Campus PPP Development
CLIENT: MUBADALA
MAIN CONTRACTOR: OGER Abu Dhabi

PAINTING WORKS - Year: 2008
Mirdif City Center - Dubai, UAE
CLIENT: Majid AL Futtaim Group
MAIN CONTRACTOR: ALEC

PAINTING WORKS - Year: 2008
WHRD-017-Repair Works, Dubai, UAE
CLIENT: DUBAL
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2008
GASCO contract # 7626-Installation of ESD Valves in Units 24,42,43,44 and Associated piping/structural /civil Works,Abu Dhabi, UAE
Insulation & Cladding works
CLIENT: GASCO
MAIN CONTRACTOR: ALSA Engineering & Construction Co.

INSULATION WORKS - Year: 2008
Dubai Metro Project- Underground Stations - Dubai, UAE
Supply & apply of Fire Resistant Coating for Fire Rated Overtrack Ducts
CLIENT: RTA
MAIN CONTRACTOR: Prime Technologies

FIRE PROOFING WORKS - Year: 2008
5Star Hotel & Mixed use Tower & Car Parks on Sheikh Zayed Road, Dubai, UAE
Fire Rated Duct works
MAIN CONTRACTOR: Hastie International Pty. Ltd.

FIRE PROOFING WORKS - Year: 2008
Dubai Metro Project - Over Ground Stations DM 001 - Dubai, UAE
Fire Proofing to Steel Structures
CLIENT: RTA
MAIN CONTRACTOR: JT Metro JV

FIRE PROOFING WORKS - Year: 2008
Dubai Metro Project- Underground Stations, Dubai, UAE
CLIENT: RTA
MAIN CONTRACTOR: Prime Technologies

PAINTING WORKS - Year: 2008
Internal Insulation of 3 Nos. Exhaust System, Dubai, UAE
CLIENT: Qatar Gas / Chiyoda
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2008
Burj Dubai Development -The Burj Tower -Package No.BD-07, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Depa Interiors

FIRE PROOFING WORKS - Year: 2008
Requisition #5005-52 GPP # 310000 Remelt & Common Sulphur Tanks, Dubai, UAE
CLIENT: Qatar Gas  / Chiyoda Corporation
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2008
Burj Dubai-Development - Dubai, UAE
Fire Sealing works
CLIENT: EMAAR
MAIN CONTRACTOR: AL ABBAR

FIRE PROOFING WORKS - Year: 2008
NKPP Vessel Inspection - Installation of Inspection Plugs on Insulated Vessels, Abu Dhabi, UAE
CLIENT: TOTAL ABK
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2008
WR 1000221: GLP -Installation of Inspection Plugs on Insulated Vessels, Abu Dhabi, UAE
Supply & Insulation works
CLIENT: TOTAL ABK
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2008
WR 10000224:KKP - Train B Vessel Insulation Replacement , Abu Dhabi, UAE
Supply and Fixing of Insulation
CLIENT: TOTAL ABK
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2008
Long Term Shutdown of Habshan and BAB,Abu Dhabi, UAE
CLIENT: GASCO
MAIN CONTRACTOR: DESCON Engineering

INSULATION WORKS - Year: 2008
AGD-O January 2007 Shutdown for Periodical Inspection & Maintenance, UAE
Insulation Removal, Re-fixing and Refractory works
CLIENT: GASCO
MAIN CONTRACTOR: DESCON Engineering

INSULATION WORKS - Year: 2008
Zirku K.O. Drum Bypass at CTU Plant- Das Island, Abu Dhabi, UAE
CLIENT: ZADCO
MAIN CONTRACTOR: DESCON Engineering

INSULATION WORKS - Year: 2008
Habshan Gas Complex Expansion Project - HGCE, Abu Dhabi, UAE
Hot & Acoustic Insulation works
CLIENT: GASCO
MAIN CONTRACTOR: CCIC

INSULATION WORKS - Year: 2008
Al Corniche Hospital - Abu Dhabi, AUE
Fire Sealing works
CLIENT: Al Corniche Hospital
Main Contractor: Contract & Maint. Est.

FIRE PROOFING WORKS - Year: 2008
Burj Dubai, The Burj Tower, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Achmidlin/Arabian Aluminium Co. JV

FIRE PROOFING WORKS - Year: 2008
Health Care City Project, Dubai, UAE
Fire Proofing for Structural Steel
MAIN CONTRACTOR: Engineering Industrial Products

FIRE PROOFING WORKS - Year: 2008
DMCC Al Mas Tower, JLT Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Taisei - ACC

FIRE PROOFING WORKS - Year: 2008
Atlantis The Palm, Jumeirah, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: BK Gulf - Rotary JV

FIRE PROOFING WORKS - Year: 2008
Burj Dubai at Businessbay, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Samsung-Besix-Arabtec JV

FIRE PROOFING WORKS - Year: 2008
Indigo Tower at Jumeirah Lake Towers, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Al Rostamani Pegel

FIRE PROOFING WORKS - Year: 2008
2B+G+7 Typical Floors at Dubai Marina, Dubai, UAE
Fire Sealing works
MAIN CONTRACTOR: Ashtaar Interior Design & Gen. Maint. LLC

FIRE PROOFING WORKS - Year: 2008
Mirdif City Center - Dubai, UAE
Fire Sealing works
CLIENT: Majid Al Futtaim Group
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2008
Dubai Metro Project- Jebel Ali Depots, Dubai,UAE
Fire Barriers & Fire Doors
CLIENT: RTA
MAIN CONTRACTOR: JT METRO JV

FIRE PROOFING WORKS - Year: 2008
Dubai Maritime City, Deira Dubai. UAE
Fire Sealing works
MAIN CONTRACTOR: Arabtec Construction

FIRE PROOFING WORKS - Year: 2008
Marina Plaza Plot 3F, Dubai, UAE
Cementitious and Intumescent fire Proofing Works
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2008
Burj Dubai Development -BD-0 12 & 13 Buildings - Dubai, UAE
Main Contract- Masonry Fire Stopping works
 Fire Sealing works
CLIENT: EMAAR
MAIN CONTRACTOR: Samsung - Baytur JV

FIRE PROOFING WORKS - Year: 2008
Burj Dubai Development -BD-0 12 & 13 Buildings - Dubai, UAE
Main Contract- Cementitious Fire Protection to Stuctural Steel
Fire Proofing works
CLIENT: EMAAR
MAIN CONTRACTOR: Samsung - Baytur JV

FIRE PROOFING WORKS - Year: 2008
UAE University-PPP Project - Al Ain, UAE
Steel Structural of Intumescent Paint
CLIENT: Mubadala
MAIN CONTRACTOR: OGER Abu Dhabi

FIRE PROOFING WORKS - Year: 2008
Burj Dubai Development -The Burj Tower -Package No.BD-07- Dubai, UAE
Fire Sealing works
CLIENT: EMAAR
MAIN CONTRACTOR: Fino International

FIRE PROOFING WORKS - Year: 2008
TAWEELAH B – Extension WI, Abu Dhabi, UAE
Insulation Works and Scaffolding works
CLIENT: ADWEA
MAIN CONTRACTOR: FISIA Italimpianti

SCAFFOLDING WORKS - Year: 2007
JEBEL ALI – Power & Desalination Station “L” Phase 2, Dubai, UAE
Thermal & Acoustical Insulation works and Scaffolding Works
CLIENT: DEWA
MAIN CONTRACTOR: FISIA Italimpianti

SCAFFOLDING WORKS - Year: 2007
Dubai Marina Mall Hotel & Apartments, Dubai, UAE
Cementitious Fire Protection to Steel Structure & Firesealing works
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2007
Jebel Ali Power & Desalination Plant, Station "L", Ph-II, Dubai, UAE
Supply and installation of Thermal Insulation
CLIENT: DEWA
MAIN CONTRACTOR: Fisia Italimpianti

INSULATION WORKS - Year: 2007
Johnson & Johnson Building at Dubai Health Care City, UAE
Supply and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Condor Building & Contracting

FIRE PROOFING WORKS - Year: 2007
Ras Laffan Olefin Project, Doha, Qatar
Supply and installation of Insulation & Refractory works
CLIENT: Qatar Gas
MAIN CONTRACTOR: Lahoud Engineering

INSULATION WORKS - Year: 2007
Tabreed Abu Dhabi District Coling Scheme Al Jazeera Club Mubadallah/Mamoura Building,Abu Dhabi, UAE
CLIENT: TABREED
MAIN CONTRACTOR: CAT

INSULATION WORKS - Year: 2007
VHFL Terminal Phase-5 Expansion,Abu Dhabi, UAE
CLIENT: TABREED
MAIN CONTRACTOR: CAT Group

INSULATION WORKS - Year: 2007
Dubai English Speaking school at Ruwaiya, Dubai, UAE
Supply & Aluminium Cladding works
MAIN CONTRACTOR: JASAF

INSULATION WORKS - Year: 2007
Dubai International Financial Center Gate Precincts, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Turner Cons. Co.

FIRE PROOFING WORKS - Year: 2007
Taweelah B Combined Cycle Power and Desalination, Abu Dhabi, UAE
Supply and installation of Thermal Insulation
CLIENT: TAPCO
MAIN CONTRACTOR: Fisi Italimpianti

INSULATION WORKS - Year: 2007
Indigo Tower at Jumeirah Lake Towers, Dubai, UAE
Supply and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Drake & Scull International

FIRE PROOFING WORKS - Year: 2007
Sohar Power & Desalination Plant, Oman
Supply and Installation of Thermal Insulation for GT, ST,
Evaporator and related piping
CLIENT: Sohar Power Plant, Oman
MAIN CONTRACTOR: Doosan Heavy Industries

INSULATION WORKS - Year: 2007
Sabah Tower at Jumeirah Lakes Tower, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: REMCO

FIRE PROOFING WORKS - Year: 2007
The Lake Terrace Tower at Jumeirah Lakes Towers, Dubai, UAE
Supply and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Al Arrab Electromechanical

FIRE PROOFING WORKS - Year: 2007
National Cement Factory - Dubai, UAE
Supply and installation of Insulation of Oil supply & return oil pipeline
CLIENT: National Cement Company

INSULATION WORKS - Year: 2007
SEWA Project at Layyah Power Station, Sharjah, UAE
Insulation of boiler and related piping works
CLIENT: SEWA
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2007
RAK Power Plant - RAK, UAE
E19/04- Boiler Plant for Northern Emirates
CLIENT: RAK Power Plant
MAIN CONTRACTOR: Nooter Ericson / CCT

INSULATION WORKS - Year: 2007
Shuweihat Project Insulation Works, Abu Dhabi, UAE
CLIENT: ADWEA
MAIN CONTRACTOR: Fisi Italimpianti
 

INSULATION WORKS - Year: 2007
Concorde Tower at Jumeirah Lakes Towers - Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Rostamani Pegel

FIRE PROOFING WORKS - Year: 2007
Restaurant at Burj Al Arab , Dubai,UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Green Line Interiors

FIRE PROOFING WORKS - Year: 2007
The World Trade Center Apartments , Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Dubai Contracting Co.

FIRE PROOFING WORKS - Year: 2007
Al Mas Tower - Dubai Metal Commodities Co. at JLT Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Taisei - ACC JV

FIRE PROOFING WORKS - Year: 2007
The Dubai Mall, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: CPD Middle East

FIRE PROOFING WORKS - Year: 2007
Between the Bridges Resort Development- Abu Dhabi, UAE
Intumescent Fire Protection for Steel & Firesealing works
MAIN CONTRACTOR: ALEC

FIRE PROOFING WORKS - Year: 2007
Qatar Gas II- Development Project, Qatar
Internal insulation of Diffuser & Stack
CLIENT: Qatar Gas
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2007
Dubai Festival City-Zone 8 B Development- Hotel & Office, Dubai, UAE
Cementitious Fire Protection to Steel -Convention Centre Roof Beams
MAIN CONTRACTOR: AL Futtaim Carrillion

FIRE PROOFING WORKS - Year: 2007
Mubadak ERDWA Bldg. at Sector 25 - Abu Dhabi, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: CCC

FIRE PROOFING WORKS - Year: 2007
AK Wellheads-GLP, Abu Dhabi, UAE
Insulation & Cladding Repair & Personnal Protection
CLIENT: TOTAL ABK
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2007
GASCO OMR 460-03, UAE
Supply and Installation of Insulation and Cladding
CLIENT: GASCO
MAIN CONTRACTOR: ThyssenKrupp Xervon LLC

INSULATION WORKS - Year: 2007
Borouge Petrochemical Project, UAE
Insulation and Cladding works for piping and equipments
CLIENT: BOROUGE
MAIN CONTRACTOR: DESCON Engineering

INSULATION WORKS - Year: 2007
Atlantis Hotel & Royal Tower at Palm Jumeirah Crescent, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: ACMT / BKG-ROTARY JV

FIRE PROOFING WORKS - Year: 2007
Auto back Wash Filter for PMP (EU-267) at Borouge - Ruwais, Abu Dhabi, UAE
Material supply, painting & insulation works for the shutdown works
at Borouge, Ruwais
CLIENT: BOROUGE
MAIN CONTRACTOR: DESCON Engineering

INSULATION WORKS - Year: 2007
The Jewels Twin Towers - Dubai Marina, UAE
Supply and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Drake & Scull International

FIRE PROOFING WORKS - Year: 2007
Between the Bridges Resort Development - Abu Dhabi, UAE
Supply and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Drake & Scull International

FIRE PROOFING WORKS - Year: 2007
Marina Mansion - Dubai Marina, UAE
Supply and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Drake & Scull International

FIRE PROOFING WORKS - Year: 2007
CCPP22 - Dubal Project, Dubai, UAE
Insulation of GT and related piping works
CLIENT: DEWA
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2006
Contarct No.C-71160-GHQ District Cooling Scheme
Supply & Apply of Fire Proofing Sprayed on Steel Structure
CLIENT: FEWA
MAIN CONTRACTOR: CAT Group

FIRE PROOFING WORKS - Year: 2006
Bab AL Shams- Golf Club at Dubai Festival City, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Khansaheb

FIRE PROOFING WORKS - Year: 2006
CCPP22 Project, UAE
Supply and Installation of Internal Insulation for boiler casing
CLIENT: DEWA
MAIN CONTRACTOR: CMI

INSULATION WORKS - Year: 2006
Re Injection Compressor Building, Dubai, Lahbab
Supply & Application of Cementitious Fire Proofing Sprayed
on Steel Structure
CLIENT: ENOC
MAIN CONTRACTOR: Margham Dubai Establishment

FIRE PROOFING WORKS - Year: 2006
Naptha Hydro Treater Reformer, Jebel Ali, UAE
Supply & Application of Cementitious Fire Proofing Sprayed
on Steel Structure
CLIENT: ENOC
MAIN CONTRACTOR: Al Futtaim Carrillion

FIRE PROOFING WORKS - Year: 2006
Fujairah Power & Desalination Plant, UAE
Design, Supply & Installation of Fire Proofing Spray material
CLIENT: FEWA
MAIN CONTRACTOR: ACC & SIX Construct

FIRE PROOFING WORKS - Year: 2006
AX 431 DIA Terminal Expansion Phase II Works, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Habtoor Murray & Roberts

FIRE PROOFING WORKS - Year: 2006
Shuweihat Power Plant, Abu Dhabi, UAE
Insulation Works and Scaffolding Works
CLIENT: ADWEA
MAIN CONTRACTOR: NECCT

SCAFFOLDING WORKS - Year: 2006
Emirates Airlines Headquarters Plot 214-877 - Dubai, UAE
Supply and Application of Cementitious and Intumescent Fire Protection to Steel
MAIN CONTRACTOR: Arabian International Co.

FIRE PROOFING WORKS - Year: 2006
The Dubai Mall, Dubai, UAE
Suppy and Application of Intumescent Fire Protection to Steel Structure
MAIN CONTRACTOR: Eversandai Engineering

FIRE PROOFING WORKS - Year: 2006
Taweelah Power Plant, Abu Dhabi, UAE
Internal Insulation of Diffuser & Stack
CLIENT: TAPCO
MAIN CONTRACTOR: Petron

INSULATION WORKS - Year: 2006
Steam Flood Generator, Rusayl - Sultanate of Oman
Installation of Refractory as well as welding works for 4 units
of Steam Flood Generators including complete supervision
CLIENT: ENFAB, USA
MAIN CONTRACTOR: Thermal Ceramics, UAE

REFRACTORY WORKS - Year: 2006
Sky Gardens Tower @ Dubai International Financial Center, UAE
Suppy and Application of Intumescent Fire Protection to Steel Structure
MAIN CONTRACTOR: Arabtec Construction

FIRE PROOFING WORKS - Year: 2006
Media One at Media City, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Jaber Grinaker LTA

FIRE PROOFING WORKS - Year: 2006
EKFC New Laundry Plot no. 598-896, Dubai, UAE
Supply & Application of  Fire Proofing Sprayed on Steel Structure
MAIN CONTRACTOR: Emirates Building Systems

FIRE PROOFING WORKS - Year: 2006
Old Town Commercial Island - Burj Site Development, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Naboodah Laing O' Rourke

FIRE PROOFING WORKS - Year: 2006
Discovery Gardens at Sheikh Zayed Road Interchange 5, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Huda Contracting

FIRE PROOFING WORKS - Year: 2006
Jumeirah Beach Residence Project- Sector 1 & 3, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Arabtec Construction

FIRE PROOFING WORKS - Year: 2006
(Z08P060) Zone 8B-Development -Hotel & Office at DFC, Dubai, UAE
Supply & Application of  Fireproofing Sprayed on Steel Structure
MAIN CONTRACTOR: AL Futtaim Carrillion

FIRE PROOFING WORKS - Year: 2006
Hyperpanda at Dubai Festival City, UAE
Supply & Apply of Sprayed Thermal Insulation
MAIN CONTRACTOR: Space Age Gen. Contracting

FIRE PROOFING WORKS - Year: 2006
WR 7005145: KPP - AMINE Regeneration Reboiler, Abu Dhabi, UAE
Supply and Installation of Thermal Insulation at TOTAL ABK Platform
CLIENT: TOTAL ABK
MAIN CONTRACTOR: INTHERPRO

INSULATION WORKS - Year: 2006
ACE Hardware at Dubai Festival City, UAE
Supply & Application of  Fire Proofing Sprayed on Steel Structure
MAIN CONTRACTOR: AL Futtaim Carrillion

FIRE PROOFING WORKS - Year: 2006
Mall of the Emirates, Sheikh Zayed Road Interchange 4, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Voltas Limited

FIRE PROOFING WORKS - Year: 2006
AX 237 - Dubai International Airport, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: EEMI

FIRE PROOFING WORKS - Year: 2006
Emirates Flight Catering Facility, Airport Dubai, UAE
Supply & Application of  Fire Proofing Sprayed on Steel Structure
MAIN CONTRACTOR: ECC - IJM

FIRE PROOFING WORKS - Year: 2006
Residential Building at AL Barsha First, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: China Railway 18TH Bureau B.G.

FIRE PROOFING WORKS - Year: 2006
ASAB & Sahil Oil Facilities Modification Project
Supply & Application of Fire Proofing sprayed on steel structure
CLIENT: ADCO
MAIN CONTRACTOR: CAT

FIRE PROOFING WORKS - Year: 2005
VIP II Terminal for Dubai Airport expansion AX 183, UAE
Supply & Application of  Fire Proofing sprayed on steel structure
MAIN CONTRACTOR: AL Hamed

FIRE PROOFING WORKS - Year: 2005
ADWEA Project
Supply & Application of Passive Fire Protection
CLIENT: ADWEA
MAIN CONTRACTOR: Heliopolis Electric Co. (H&E)

FIRE PROOFING WORKS - Year: 2005
ADNOC Group Companies New Headquaters - Abu Dhabi, UAE
Supply & Application of Fire Sealants
CLIENT: ADNOC
MAIN CONTRACTOR: ETA

FIRE PROOFING WORKS - Year: 2005
National Cement Factory – Dubai, UAE
Jet-Pulse Fabric Filter Insulation works
CLIENT: National Cement Factory
MAIN CONTRACTOR: Sabari Steel

INSULATION WORKS - Year: 2005
Platinum Project - Jebel Ali, UAE
Cladding of main engine exhaust outside capsule and
installation of Glass cloth
CLIENT: Dubai Port Authority
MAIN CONTRACTOR: Dubai Port Authority
 

INSULATION WORKS - Year: 2005
Mall of the Emirates, Sheikh Zayed Road Interchannge 4, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Jaber ALEC

FIRE PROOFING WORKS - Year: 2005
Shuweihat S1 Independent WI, Abu Dhabi, UAE
Insulation Works and Scaffolding works
CLIENT: ADWEA
MAIN CONTRACTOR: FISIA Italimpianti

SCAFFOLDING WORKS - Year: 2005
Park Place Tower, Trade Centre 1 Sheikh Zayed Road, Dubai, UAE
Supp and Application of Fire Protection to Air Handling Ductwork
MAIN CONTRACTOR: Drake & Scull

FIRE PROOFING WORKS - Year: 2005
Al Wathba Substation, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Seimens

FIRE PROOFING WORKS - Year: 2005
Ministry of Foreign Affairs, Abu Dhabi, UAE
Supply & Apply of sprayed Thermal Insulation
MAIN CONTRACTOR: SIX Construct

FIRE PROOFING WORKS - Year: 2005
Burj Dubai Development -Old Town Development, Sites A & B , Site A Phase 2, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Jaber / ALEC

FIRE PROOFING WORKS - Year: 2005
IBN BATUTA -Garden City Mall, Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: ETA

FIRE PROOFING WORKS - Year: 2005
IKEA & Hypermarket at Dubai Festival City, UAE
Supply & Apply of Sprayed Thermal Insulation
MAIN CONTRACTOR: Higgs & Hill / ACC
 

FIRE PROOFING WORKS - Year: 2005
Al Rostamani Towers, Dubai Marina, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: AL Rostamani Pegal

FIRE PROOFING WORKS - Year: 2005
Abu Dhabi International Airport -Interim Passenger Facilities, UAE
Supply & Application of  Fire Proofing sprayed on steel structure
MAIN CONTRACTOR: AL Jaber Energy Services

FIRE PROOFING WORKS - Year: 2005
New Diwan building, Al Ain, UAE
Supply & application of Cementitious & Intumescent paint to steel structure
MAIN CONTRACTOR: Seidco Contracting Co.
 

FIRE PROOFING WORKS - Year: 2005
Dubai Flower Centre, Airport Dubai, UAE
Supply & application of Intumescent paint to steel structure
MAIN CONTRACTOR: AL Habtoor Murray & Roberts
 

FIRE PROOFING WORKS - Year: 2005
American University-Sharjah, UAE
Supply & Application of  Fire Proofing sprayed on steel structure
MAIN CONTRACTOR: Gulf Lebanese Enterprises

FIRE PROOFING WORKS - Year: 2005
Jebel Ali Terminals , Jebel Ali, UAE
Supply & Application of Cementitious Fire Proofing Sprayed on Steel Structure
CLIENT: Margham Dubai Establishment

FIRE PROOFING WORKS - Year: 2004
Shuweihat S1 IPP, Abu Dhabi, UAE
Supply and Apply of Insulation works for Desalination Plant
and related Piping.
CLIENT: SCIPCO
MAIN CONTRACTOR: Fisia Italimpianti

INSULATION WORKS - Year: 2004
Kestrel Project, Jebel Ali, UAE
CLIENT: CMI
MAIN CONTRACTOR: CMI, Belgium

INSULATION WORKS - Year: 2004
Sharjah Cement Factory - Sharjah, UAE
Supply and installation of Thermal Insulation for Slag Dryer Fan,
Chimney and Vent Ducts & Door.
Supply and installation of Thermal Insulation for Main Bag Filter, Cyclone,
 Inter connecting Ducts & Dryer Outlet.
CLIENT: Sharjah Cement Factory

INSULATION WORKS - Year: 2004
Shuweihat S1 IPP, Abu Dhabi, UAE
Suply and Apply of Insulation works for HRSG Boiler and related Piping
CLIENT: SCIPCO
MAIN CONTRACTOR: Nooter Ericson / CCT

INSULATION WORKS - Year: 2004
NEB Phase 1 Development Project, UAE
Supply and installation of Thermal Insulation for piping and equipment.
CLIENT: ADCO
MAIN CONTRACTOR: NPCC

INSULATION WORKS - Year: 2004
Bab Field Production Facilities - Abu Dhabi, UAE
Supply & Application of Fire Proofing Sprayed
& Trowelled on steel structure supports
CLIENT: ADCO
MAIN CONTRACTOR: DESCON Engineering

FIRE PROOFING WORKS - Year: 2004
Conference Palace - Abu Dhabi, UAE
Supply & Application of Cementitious Fire Spray CAFCO material
MAIN CONTRACTOR: Six Construct

FIRE PROOFING WORKS - Year: 2004
Endurance City Desert Hotel - Al Ain, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Transgulf

FIRE PROOFING WORKS - Year: 2004
Emirates New Engineering Centre Project - Dubai, UAE
Supply & Application of Intumescent Paint to Steel Structure
MAIN CONTRACTOR: National Wheel J & P

FIRE PROOFING WORKS - Year: 2004
Dubai Creek Golf & Yacht Club - Five Star Hotel Project Dubai, UAE
Supply and Application of Fire Sealants
MAIN CONTRACTOR: Bu Haleeba

FIRE PROOFING WORKS - Year: 2004
Camel Tannery & Service Building-Al Khazana, UAE
Supply & Application of Intumescent Paint to steel structure
MAIN CONTRACTOR: AL Hamed

FIRE PROOFING WORKS - Year: 2004
Construction of NEB Phase 1 - Dev't Buildings & Services Package, UAE
Supply & application of Cementitious & Intumescent paint to steel structure
MAIN CONTRACTOR: Target Engineering Construction

FIRE PROOFING WORKS - Year: 2004
Madinat Jumairah Phase 3- Dubai, UAE
Supply And Application of Passive Fire Protection
MAIN CONTRACTOR: Bu Haleeba-Al Jaber

FIRE PROOFING WORKS - Year: 2003
BHV Shopping Mall, UAE
Fire rated Ductwork
MAIN CONTRACTOR: EPICO

FIRE PROOFING WORKS - Year: 2003
Dar Al Nahar, UAE
Fire Rated Ductwork
MAIN CONTRACTOR: Dar AL Handasa

FIRE PROOFING WORKS - Year: 2003
Madinat Jumairah Phase 2- Dubai, UAE
Supply And Application of Passive Fire Protection
MAIN CONTRACTOR: AL Habtoor Murray & Roberts

FIRE PROOFING WORKS - Year: 2003
RAK Cement Plant - RAS Al Khaimah, UAE
Installation of Refractory brick lining for the kiln
CLIENT: RAK Cement Plant, UAE
MAIN CONTRACTOR: INTHERPRO

REFRACTORY WORKS - Year: 2001
RAK Cement Plant, Ras Al Khaimah, UAE
Full installation of refractory bricks & castables for the
New Production Line (Preheater, Precalciner, Cyclones, Kiln, Cooler, Chutes)
CLIENT: RAS Cement Plant, UAE
MAIN CONTRACTOR: SDEM, France

REFRACTORY WORKS - Year: 1999

 

©Copyright 2009.Intherpro Ltd.